Tekkun, have you seen Imperia's finishing?
If you use Imperia's progress, there is no way Encorp can handover keys by end 2017.
A more realistic estimate would be 18mths after Encorp is built to the top floor.
Noticed tat encorp has this ugly perimeter fencing surrounding the facade. At the units balconies n etc. It looks like those green coloured metal road fencings that we have in spore. The ones that LTA puts up in the middle of the road to prevent jay walkers. Yikes!
It is a requirement that construction sites are fenced up for safety purposes.
Surely you do not want busy bodies getting accident in a site where it is not handed over to the local council yet.
Extension of completion period and late delivery charges are totally different items. One is project, the other is contract.
They still have 15 more levels to go. Assuming they can do 3 levels in 2 months, the fastest they top up would be Dec 2016. Give another 6 ~8 mths for finishing, it should be late 2017.
They have already asked for interior fit-out design.
Hmmm, think the fence did came out in 1 of encorp's advert photo. I doubt it's meant for construction. It's part of the facade
I took those pictures. They are temporary green safety netting to define the edge of building.
I didn't say netting. I said fence. It's brown in colour
Got picture to show? I like to know how it looks like.
I think he is referring to the bronze anodised aluminium sun screen panels at the balcony.
So cheem uh the name of the fence? Well I just call it LTA fence. Ugly.
Noticed tat encorp has this ugly perimeter fencing surrounding the facade. At the units balconies n etc. It looks like those green coloured metal road fencings that we have in spore. The ones that LTA puts up in the middle of the road to prevent jay walkers. Yikes!
View attachment 26158
I went to PH this afternoon, and took this pic. The railing of the balcony is really ugly...but i think they will paint it white or grey subsequently (based on the pictures in their website/marketing brochure)