- Joined
- Apr 13, 2011
- Messages
- 298
- Points
- 18
Nice. Can consider day-trips to Desaru ... or stay overnite at one of the resorts ..
Shld be a nice drive and scenic over the new bridge ..
75km Senai-Desaru Expressway
http://www.e22.com.my/The-Map.html
http://www.skyscrapercity.com/showthread.php?t=956216
2011/06/09
JOHOR BARU: Travelling between southwest and southeast Johor will be faster and more comfortable with the opening of the 75km Senai-Desaru Expressway today.
The highway, costing RM1.4 billion, is one of the biggest infrastructure projects under the Ninth Malaysian Plan in Johor.
It provides an important transportation link to further boost the logistics and tourism sectors in the southern region.
With the highway, travel time is about an hour between Desaru, in the south-east, and the Second Link or Tanjung Pelepas, in the south-west.
This is a stark contrast compared with the 21/2 hours of travelling along the trunk road.
In conjunction with the opening of the new highway, codenamed SDE, motorists will enjoy a toll-free journey for one month from today.
Toll collection will begin from July 10.
Shld be a nice drive and scenic over the new bridge ..
75km Senai-Desaru Expressway
http://www.e22.com.my/The-Map.html
http://www.skyscrapercity.com/showthread.php?t=956216
2011/06/09
JOHOR BARU: Travelling between southwest and southeast Johor will be faster and more comfortable with the opening of the 75km Senai-Desaru Expressway today.
The highway, costing RM1.4 billion, is one of the biggest infrastructure projects under the Ninth Malaysian Plan in Johor.
It provides an important transportation link to further boost the logistics and tourism sectors in the southern region.
With the highway, travel time is about an hour between Desaru, in the south-east, and the Second Link or Tanjung Pelepas, in the south-west.
This is a stark contrast compared with the 21/2 hours of travelling along the trunk road.
In conjunction with the opening of the new highway, codenamed SDE, motorists will enjoy a toll-free journey for one month from today.
Toll collection will begin from July 10.