- Joined
- Nov 13, 2012
- Messages
- 618
- Points
- 0
haha...its good to have dreams.
Who knows? maybe possible in 15 years' time....
Who knows? maybe possible in 15 years' time....
haha...its good to have dreams.
Who knows? maybe possible in 15 years' time....
Yah right now i only can dream to stay in this terrace house which i can't afford to buy in singapore but worries about the traffic conditions.
my unit is phase 5 type D end-lot with a 10-feet land at the side..... and behind is the shops.... a location where most do not find it attractive due to security concerns.... hehehehe..... but me like! just open the back-door and walk out for mamam..... easy!
Phase 5 type D already construct windows and door done liao izzit?
Not been there for around 3 weeks already, the last time i was there, my unit was still only at the stage of foundation..... should be at the site again most probably tomorrow around lunchtime!
Can someone enlighten me as to around when was the first SPA was signed for phase 5 type D? Just wondering as to the estimated completion date..... thanks in advance
Just went yesterday.that's fast.
What about type D Phase 5?
If the key will to release together, I rather mine to be slow. At least the payment also slow.Just went yesterday.
If I can remember, the front roll facing the open field is damn fast.. The whole building already up.. including rooftop
But those back rolls are much slowly & all at difference stage depending which roll your house
Just went yesterday.
If I can remember, the front roll facing the open field is damn fast.. The whole building already up.. including rooftop
But those back rolls are much slowly & all at difference stage depending which roll your house
Hi ComingToJB-san, when you said facing the open field, do you mean facing the Jalan Sentral Utama?
I mean facing the football field.
And it seems phase 4 & 5 are constructing almost the same time.. In fact some phase 4 are lag behind some phase 5