At a glance, I thought wp is screwed because the figures given were :
1. 16000 did not pay sc cc.
2. They lost 4.4million in 2 years.
After finding out that the sc cc charges ranges from about $50 to $90 per month, something is not right with the numbers. If 16000 did not pay sc cc continuously (using an average of say $60 per month), then each year, they will be short of 11 million. Therefore, the 16000 is most probably the number of residents who do owe sc cc (of varying amounts) but not that they don't pay all the way.
The lost of 4.4 m has been attributed to loss from Hg. However, what was the deficit of Hg as at 2011. It should be in their record and can be easily surfaced to match and confirm the allegation.
SL ever talk about grants receivable for projects already completed but did not materialize once they took over. Is the 4.4 m a result of this? I hope whoever that is fixing the game knows what he/she is doing. If it backfired, the results can be real ugly. As to the porlumpar, their masters know what they are doing. These clowns best stop borrowing figures and reconfiguring them to paint a wrong picture. It is changing the direction and bad for the game. They are real nightmare to the masters.