• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

$1.5 billion cost overrun on Expressway. Sinkie Taxpayers have to pay

Papsmearer

Alfrescian (InfP) - Comp
Generous Asset
Apparently, after paying their high multi million dollar salaries, our fantastic PAP ministers can still run a $1.5 billion cost overun on the Marina Coastal Expressway. In the first place, to spend $4 billion for this makes no sense to me. what are they trying to do? Save time on travel? Time savings from using this is not that great and not worth $4 billion.


Fri, Jan 16, 2009
The Straits Times




Wide gap in tender bids for most expensive road

By Christopher Tan, Senior Correspondent

THE tender to build a complicated stretch of Singapore's most expensive road has drawn two hugely different bids.

The Land Transport Authority (LTA) called for tenders to build the Marina Wharf section of the underground-undersea Marina Coastal Expressway in March last year and two bidders were shortlisted.

Home-grown Hock Lian Seng Infrastructure submitted a bid of $305 million. And a joint venture between German construction company Ed Zublin and Singapore Piling bid twice the amount, with submissions from $600 million to $626 million.

Although the tender closed four months ago in September, the LTA has not awarded the contract.

Industry experts were bewildered by the vast difference in the two bids. A manager at a foreign company that has built several road and rail projects here said: "We're not talking about $20 million, $30 million here. With $300 million, you can buy a skyscraper in Shenton Way."

Others said that if the LTA cannot come to a decision soon, it may have to recall the tender - and risk delaying the works.

"Evaluation of this tender is currently ongoing. It is inappropriate to make any comment at this juncture," said an LTA spokesman.

Work on the 5km 10-lane road linking the Kallang-Paya Lebar Expressway (KPE) to Ayer Rajah Expressway is scheduled to start this quarter, and due for completion in 2013.

So far, contracts worth $3.7 billion have been awarded. These were largely for civil works, which were divided into six parcels. The first five were clinched by Japanese and Korean builders.

The sum already exceeds the $2.5 billion estimated price tag when the project was announced in 2007.

The highway is Singapore's most expensive road, outstripping the $1.7 billion KPE.

The LTA attributed the escalated cost to poor soil conditions, land reclamation and the general increase in material costs.

The sixth and final civil contract to be awarded is for one of the more challenging portions of the project. It involves land reclamation at the seafront of the Marina Wharf area.

"The LTA may have a problem. The lower bid may be too low to be feasible. But if it picks the higher bid, it may have to answer to taxpayers," said another builder familiar with LTA projects.

Hock Lian Seng would not comment on its bid, while Singapore Piling parent group BBR could not be reached for comment.



This article was first published in The Straits Times on Jan 14, 2009.
 