[h=1]REAL REASON MRT KEEPS BREAKING DOWN: OVERWORKED EMPLOYEES[/h]
Post date:
5 Mar 2015 - 1:54pm

I have a good friend who works for one of the MRT operators (SMRT and SBS).
This friend told me that the real reason why MRT keeps breaking down and causing delays is because of overworked employees.
Both MRT operators require their employees (especially those dealing in train maintenance and operations) to work 7-days straight on rotating shifts.
Train drivers, station staff, control centre staff, technical staff, maintenance staff, operations staff, etc. are all required to work 7-days shift.
All those staff are overworked and may jeopardise the operation of the MRT trains, or even the safety of passengers.
As the lives of passengers are in the hands of those staff, the two authorities, namely Land Transport Authority and Ministry of Manpower should do a thorough investigation on this matter.
A Concerned Passenger
TRS Contributor
Post date:
5 Mar 2015 - 1:54pm

I have a good friend who works for one of the MRT operators (SMRT and SBS).
This friend told me that the real reason why MRT keeps breaking down and causing delays is because of overworked employees.
Both MRT operators require their employees (especially those dealing in train maintenance and operations) to work 7-days straight on rotating shifts.
Train drivers, station staff, control centre staff, technical staff, maintenance staff, operations staff, etc. are all required to work 7-days shift.
All those staff are overworked and may jeopardise the operation of the MRT trains, or even the safety of passengers.
As the lives of passengers are in the hands of those staff, the two authorities, namely Land Transport Authority and Ministry of Manpower should do a thorough investigation on this matter.
A Concerned Passenger