• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

Today Yishun MRT crowd spills dangerously.......6.9 million how ar?

Force 136

Alfrescian (Inf)
Asset
Joined
Mar 9, 2011
Messages
2,832
Points
48
platform%20%282%29.jpg


PM Lee.... Help........ no space for me to get to platform....

platform%20%281%29.jpg


Spill until one floor down......

When the 6.9 million comes..... how ar?

:confused::confused::mad::mad:

PM Lee.... please come and take MRT ... can? No need drive Taxi to know our feelings....
 
The new target is 8 million and at least half of them have to be foreigners.
 
When will the government understand our problems.
WE DO NOT WANT FT INTO OUR COUNTRY.
U want a conversation with us.
we told u but u dont listen.
 
When will the government understand our problems.
WE DO NOT WANT FT INTO OUR COUNTRY.
U want a conversation with us.
we told u but u dont listen.

You wait!

Leongsam will trot along here soon and call you a twit and that whatever PAP do in Singapore is the best
 
upon closer examination, the high ceiling gives opportunity to squeeze in more people... the white scums at lta, smrt just need some brain to come up with creative solutions

Exactly, we have great engineers who earn million dollars salary (under Gov. minister salary benchmark).
They can invent and create double-layer platform and steps to enter and exit train directly.
Ha ha...
 
Last edited:
Obviously whoever designed the MRT system did not plan on having so many breakdowns & delays that is all so common today;)
 
platform%20%282%29.jpg


PM Lee.... Help........ no space for me to get to platform....

platform%20%281%29.jpg


Spill until one floor down......

When the 6.9 million comes..... how ar?

:confused::confused::mad::mad:

PM Lee.... please come and take MRT ... can? No need drive Taxi to know our feelings....

With this type of crowd, when you faint, your head won't get injured.
 
ppl still complain here and telling the garment how they feel as if the garment gives a rat's ass.
 
Yishun n woodlands is fill up with tons of malaysian trash.
tons as in really kan ni na beh pua cheebye alot.
 
Stair ways lead to second level, stairways from second level to alternate MRT train doors, top metal grills from top roof down to appropriate height to prevent people jumping on top of MRT train or tracks from second level. Provided existing structure can take the additional weight of the additional structure and customer weight load.

Can't help it, wait for these mutherfuckers parasites to come out with solutions, some accidents may have happened.:o

upon closer examination, the high ceiling gives opportunity to squeeze in more people... the white scums at lta, smrt just need some brain to come up with creative solutions
 
Last edited:
Back
Top