• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

SMRT fucked up again

bobby

Alfrescian
Loyal
Joined
Jun 11, 2017
Messages
17,348
Points
113
1735950345637.jpeg
 
So fucked up still want to build the Jurong Region Line and Cross Island Line. :biggrin:

The TEL is a fairly new MRT line, you can't blame it on wear and tear like what happened to the EWL. :cool:
 
More fucked-ups ,Chee HT will be promoted to senior minister. 555
 
Tiagong CHT is a rising Star de woh...:D
 
Last edited:
All these lines are symptomatic of a larger constraint. You have to build all sorts of lines around the central catchment areas.

Get rid of it and you suddenly have 30% more usable land area for condos.

Let them drink shit water. Who cares?
 
We need more public transport fare 'revisions' or 'adjustments' to help solve those problems. :wink:
 
at that time was heavy downpours all over SG.

is there a correlation between trains stalling and heavy rain fall ?

just my two cents ...

Nope. Its just bad maintenance. If not, there will be train fault every time its raining.

All that fare hike is to feed the jiak liao bee fat cat executives at AssMRT. Screw the maintenance.
 
Nope. Its just bad maintenance. If not, there will be train fault every time its raining.

All that fare hike is to feed the jiak liao bee fat cat executives at AssMRT. Screw the maintenance.

Are the abangs still working on it? :o-o:

SMRT-we-working-on-it-ads.jpg
 
Are the abangs still working on it? :o-o:

SMRT-we-working-on-it-ads.jpg

these people all can sack liao .... work so hard, do so many repair, still can break down ..... means they have no quality in their work and they are incompetent in maintaining the necessary. :whistling:
 
Back
Top