NEL MRT breakdown have too many question ???
What management do?
1st power suply problem then said signaling problem.
Why
1. Why never prepare free shuttle bus to reduce congestion?
2. Why dont repair the power cable bolt broken and signaling problem when detected on about 2.30pm. That none peak hour. Just stop the whole NEL line for 2~3hour to repair the fault so can resume when peak of 5pm. Guide commuter to use shuttle bus.
I think I can be better SMRT CEO.