No meaningful mass market availability until 2028 and beyond
Initial production will be very limited but it will be ramped up through 2027 and 2028, although there could still be setbacks that postpone it again. However, actual mass production is planned for “2030 and beyond,” according to a post on Toyota Times.
In a recent press release published by Toyota, the manufacturer says it will begin solid-state battery production “starting from 2026” and that this will be “gradually implemented.” With its next-generation performance battery (which will be built by two third parties for Toyota), it wants to reach an annual production target of 9 gigawatt-hours, although this combined figure will be achieved over time.
Initial production will be very limited but it will be ramped up through 2027 and 2028, although there could still be setbacks that postpone it again. However, actual mass production is planned for “2030 and beyond,” according to a post on Toyota Times.
In a recent press release published by Toyota, the manufacturer says it will begin solid-state battery production “starting from 2026” and that this will be “gradually implemented.” With its next-generation performance battery (which will be built by two third parties for Toyota), it wants to reach an annual production target of 9 gigawatt-hours, although this combined figure will be achieved over time.