Went to the site yesterday during noon time.
The site is very active as I saw many construction workers trooping out from the site for lunch break.
Went to the main gate and have a look at the site. Noticed it is building level 1 now. Saw alot steel works and I think they are preparing the crane base too..
Spoke to a local chinese foreman. He said generally the foundation and level 1 take the longest to build.. once done, the progress will be very fast.
Being on raised ground, with uneven terrain in Medini area( hilly) all the more I think foundation takes time. But our VP date is a long way off so they should catch up.Anyway, the later the better as we will have more facilities in Medini by then and have to wait lesser time for the things to take off. Easier to rent out when the place is abuzz rather than a construction site.