Not many people know that it was Kawasaki who first supplied the HSR technology to China on a JV basis.
Hitachi also provided the signalling inputs.
They have so much investment money in Iskandar. If the authorities are really efficient enough, it will be nice to have better connectivity around the many residential areas leading to Legoland.
But this is JB, I'm not banging my hopes on this happening.
To even have the HSR happening already sounds like a miracle!
I think a regular themepark bus would be good enough.
Those which has this big Legoland dedicated bus departing from PH or future HSR station and stopping in a few prominant areas enroute to the themepark. No need rail network.
To be provided by who? The theme park? The inference is that the authorities should run a loss making public service for affluent, many non-voting, residents to be seen as efficient.
Bingo!I think just get the HSR and RTS up and running 1st..
"During the joint-announcement, Najib and Lee also announced the proposed Malaysia-Singapore RTS link expected to be up and running by 2018."
If they really can match the time line when most condo projects are nearing completion or completed it would really be huat until gao gao!
I'm keeping a very low expectation as I do not want to be disappointed. At the moment, I'm taking as it's not going to happen :p
If it is just the link between Woodlands and JB there is good chance of it materialising within 3 years. Connectivity with other parts of JB maybe must wait till SG100. LOL!
"During the joint-announcement, Najib and Lee also announced the proposed Malaysia-Singapore RTS link expected to be up and running by 2018."
If they really can match the time line when most condo projects are nearing completion or completed it would really be huat until gao gao!
Its impossible to be ready by 2018. LTA already stated in a Zaobao report that the 2nd phase engineering studies will take 2 years, starting from 2016.
"LTA says that the JBRTS will be around 4-5km, actual length will be confirmed after the Stage 2 engineering studies are completed. The engineering study is expected to complete in 2 years, and include studies on whether the underwater tunnels, bridge or a combination of both will be proposed. The 2 countries will also discuss on how the construction costs will be shared, and details on future operations of the line. This means that the JBRTS will not be ready in time for the opening of TEL Stage 1 on 2019."
http://mypaper.sg/chinese-news/xin-...li-di-2jie-duan-gong-cheng-yan-jiu-jiang-zhan
Bro Frodo,
Fret not, I'm sure u bought into Iskandar not bcoz of RTS/HSR etc.
These measures are just icing on the Cake for u and many of us.
If it happens Good. If not life goes on bro.
We're not speculators ma.
Very true! On the other hand, with the prospect of the station located next to Republic Poly, maybe finding a retirement job there might be a good idea.
Hope to see Lecturer Frodo soon at Republic Poly!