- Joined
- Oct 23, 2013
- Messages
- 26,183
- Points
- 113
well said...i will add to your pointsLongest for fuck?? My cock also very long.
Most important is no breakdown.
well said...i will add to your pointsLongest for fuck?? My cock also very long.
Most important is no breakdown.
well said...i will add to your points
"I will add to your points" and "I have added to your points" are 2 different things. Someone said to me, Well said, I will add to your points and till today nothing happen..kekeke
ask erotica if i added....
the worst culprit is Leongsam...always say add but did not :oIo:
You really one Pee-a-pee cocksucker aren't you ? Must be under gahmen payroll to propagate your blind love here.
Longest for fuck?? My cock also very long.
Most important is no breakdown.
Speaking at the opening ceremony at Downtown station, PM Lee said this first stage marks the beginning of plans to double the rail network to 360km by 2030.....
According to official documents published by LTA whose URLs are as follows:
http://www.lta.gov.sg/content/dam/l.../files/FactsandFigures/Rail Length (2012).pdf
http://www.lta.gov.sg/content/dam/l...files/FactsandFigures/Stats_in_Brief_2013.pdf
Total rail length is about 178 km (end 2012) for a population of 5.3 million inhabitants
If LEEgime's target is 360 km by 2030, what is the number of inhabitants is Pinky looking at? 10 million? 9 million? 8 million?
Bros, please help me do the math
Unlike Pinky, I am no math scholar, President scorer or study math at Cambridge.
Someone said to me, Well said, I will add to your points and till today nothing happen..kekeke
The first stage of the new Downtown Line was opened by Prime Minister Lee Hsien Loong Saturday morning and the public will be able to start riding on the 4.3km line from Sunday.
Speaking at the opening ceremony at Downtown station, PM Lee said this first stage marks the beginning of plans to double the rail network to 360km by 2030. He noted that the Government is continuing to invest in public transport infrastructure to make Singapore a better home and raise the quality of life. In the immediate term, 16 new bus routes and 111 existing bus services have been improved through the ongoing Bus Service Enhancement Programme, he said.
The Government is also investing more resources into maintaining and servicing existing train infrastructure, and this has improved service and reliability standards, he added.
The six stations along Downtown Line Stage 1 are Chinatown, Telok Ayer, Downtown, Bayfront, Promenade and Bugis. Downtown Line Stage 2, which runs from Bukit Panjang along the Bukit Timah Road corridor, will be ready in 2016 while Stage 3 in the east will open in 2017. Once fully completed, the 42km Downtown Line will be the world's longest driverless underground MRT line.
Prime Minister Lee Hsien Loong taking a ride along the new Downtown Line on Dec 21, 2013. With him are Senior Minister of State for Transport Josephine Teo and Transport Minister Lui Tuck Yew. -- ST PHOTO: DESMOND FOO
Congratulations Singapore!!!
Another goal to make Singapore the best city in the world!!!
Look at Pinky ...he seems so nervous ...no smile ...like he was afraid that the train would breakdown and then he has to walk in the tunnel to get out.
Hey, kopi ... Good news for you
http://www.singsupplies.com/showthr...able-PAP-Regime-Downtown-Line-1st-Day-Failure
jsut a little hiccup
no problem lah
every successful story starts with a little hiccup
no problem lah
the downtown line one will be one greatest line driver less...