Can any sexperts advised how this cooling tower thing works? Is it like an evaporative cooler used outdoors ? Ducted refrigerated air-conditioning makes the atmosphere cooler and air dryer....so how does this tengah crap work?
Is the boss of Daikin a PBM?Tiagong Daikin Singapore is owned by a grassroots leader.
Can any sexperts advised how this cooling tower thing works? Is it like an evaporative cooler used outdoors ? Ducted refrigerated air-conditioning makes the atmosphere cooler and air dryer....so how does this tengah crap work?
Why Minister Desmond Lee never visit Tengah?Our ministers never adjust their lifestyles
In theory sound good (to fill up the coffers for the contractors) but in reality is a horror show.
.
.
.
Besides huge fugly trunking, it's a most kum gong inappropriate design not meant for residential areas like horror disaster waiting to happen.
Such commercial concepts has been applied successfully on industrial/commercial offices simply because it is designed to be applied across large floor spaces with centralized ceiling blower units which has less variation in cooling timing during office or opening hours. Hence power savings can be achieved through sheer economies of scale.
It should never be force-fed into individual small pigeon holes as the chilled system are never meant to be designed this way. In fact it becomes less efficient when there are too many chilled water pipes being routed to individual units which are turned on/off at different times by low-ses HDB owners - worse for different rooms some more throughout the day, resulting in uneven load and long cooling times.
In theory sound good (to fill up the coffers for the contractors) but in reality is a horror show.
.
.
.
Besides huge fugly trunking, it's a most kum gong inappropriate design not meant for residential areas like horror disaster waiting to happen.
Such commercial concepts has been applied successfully on industrial/commercial offices simply because it is designed to be applied across large floor spaces with centralized ceiling blower units which has less variation in cooling timing during office or opening hours. Hence power savings can be achieved through sheer economies of scale.
It should never be force-fed into individual small pigeon holes as the chilled system are never meant to be designed this way. In fact it becomes less efficient when there are too many chilled water pipes being routed to individual units which are turned on/off at different times by low-ses HDB owners - worse for different rooms some more throughout the day, resulting in uneven load and long cooling times.
Knn
This technology ain't new.
Who fuck this project up ?
Why hotels and buildings are doing it so easily and duplicated across the board ? We don't have issues with it.
In theory sound good (to fill up the coffers for the contractors) but in reality is a horror show.
.
.
.
Besides huge fugly trunking, it's a most kum gong inappropriate design not meant for residential areas like horror disaster waiting to happen.
Such commercial concepts has been applied successfully on industrial/commercial offices simply because it is designed to be applied across large floor spaces with centralized ceiling blower units which has less variation in cooling timing during office or opening hours. Hence power savings can be achieved through sheer economies of scale.
It should never be force-fed into individual small pigeon holes as the chilled system are never meant to be designed this way. In fact it becomes less efficient when there are too many chilled water pipes being routed to individual units which are turned on/off at different times by low-ses HDB owners - worse for different rooms some more throughout the day, resulting in uneven load and long cooling times.
So it's a totally useless system for HDB flats, so exciting! Can't wait to see this to Tengah flats!!!Commercial units are customers (tenants) comfort first with more consistent and predictable operating times. Their centralized chilled system is designed to be applied across large floor spaces with centralized ceiling blower units which has less variation in cooling timing during office or opening hours. Hence power savings can be achieved through sheer economies of scale with proper cooling.
Whereas for this Tengah BTO, HDB under the guise of 'Sustainable Design' to reduce carbon footprint, imposed all kinds of ranjiao cost-savings KPI pressure on SP Group/Daikin to meet their Green agendas without giving due diligence to the well-being of residents. As a result, many units did not have proper insulations with leaking issues.
Coolie-gene residents also have unpredictable operating times which makes load distribution extremely difficult to operate with pipes going into individual pigeon hole units with own blowers in each room, unlike hotels or commercial offices/units. Hence many residents experienced ridiculously long time to cool. If they want faster cooling, will Jiak Dian, need to activate compressors/chilled water pump to work harder to draw more power, which defeats the whole purpose of the centralized chilled system, so all have to GG together and farked big time in the arse til shiok shiok.
the aircon is not free...its all based on metered calculation in the riser.Can any monkey staying in such hellholes tell me electric bill how to calculate? Free Aircon so good?
the aircon is not free...its all based on metered calculation.
Many hotel not built by cheapest chinaman. Malaysia doesn't use such trash. Only low iq sinkies love itKnn
This technology ain't new.
Who fuck this project up ?
Why hotels and buildings are doing it so easily and duplicated across the board ? We don't have issues with it.