• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

Serious A Series of Unfortunate Events Led To MRT Train Breakdown On 14 Oct 2020! Guess The Race Of The Technicians Who Fucked Up Big Time!

JohnTan

Alfrescian (InfP)
Generous Asset
1602771889683.png


SINGAPORE: A breakdown of insulation of a power cable and an attempt to restore power to two MRT lines without "first isolating the fault" led to disruption in train services on Wednesday night (Oct 14), SMRT said on Thursday.

The transport operator apologised on Thursday for the disruption during peak-hour traffic on Wednesday evening.

The disruption affected train services from Woodlands to Jurong East on the North-South Line, Queenstown to Gul Circle on the East-West Line, and HarbourFront to Serangoon on the Circle Line.

1602771910665.png


1602771899522.png


Some commuters had to walk on tracks to make their way back to the station, while bus stops were packed with commuters looking for alternative ways to continue their journey.

Train service on the Circle Line resumed at about 8.40pm, while services on the North-South and East-West lines resumed at about 10.35pm.

The disruption started with a breakdown of insulation of a power cable between Tuas Link and Tuas West Road stations, SMRT said, citing its preliminary findings.

A circuit breaker at Tuas West Road station "should have kicked in" to isolate the fault, but it did not, said SMRT in its media release. This caused the North-South and East-West lines power system to trip.

To restore power to these lines, there was an attempt to draw power from the Buona Vista Intake substation.

But this was done "without first isolating the fault", resulting in a power supply disruption to the Circle Line, as the Buona Vista Intake substation also serves the Circle Line.

"The insulation fault has been identified and isolated and the faulty component of the circuit breaker has been replaced," SMRT said, adding that train services were running normally on Thursday.

https://www.channelnewsasia.com/new...breakdown-stations-power-cable-fault-13285610
 

Nice-Gook

Alfrescian
Loyal
A very famous American quote comes to mind , That is ,” the buck stops here “

I beleive president Truman had that sign in his office

in management terms , yes ! All of you guys are responsible but only the head is accountable

Comprende?
 

zeddy

Alfrescian (Inf)
Asset
Can't really blame the technicians. This kind of thing , engineers usually in charge of the decision makings.
 