Just moved into my new 4rm pegion hole for 2 weeks and already found so many defects in my new home :(
1) Water pipe joining cracked and burst in the middle of the nite . Have to wait till 2pm the next day for them to come and fix it . ( Best part is they ask if they can come 1 week later. I ask them back can I go to her home and bathe)
2) Part of the new window fell off ( less than 2 weeks after moving in )
3) Bathroom Tiles crack and fell off within the 1st week. They got the cheek to tell me my contractor did it when its those tiles that they mount the standard HDB shower heads. Best is when they come to fix they discover that only got a bit of cement sticking the tiles and below its all hollow.
4) The cloth hanging fixture before I can use it its already spoil. 1 pull one side comes down the other side stuck have to have them fixed it b4 I even move in :(
So my advice to all bros out there check your new pegion hole properly.
1) Water pipe joining cracked and burst in the middle of the nite . Have to wait till 2pm the next day for them to come and fix it . ( Best part is they ask if they can come 1 week later. I ask them back can I go to her home and bathe)
2) Part of the new window fell off ( less than 2 weeks after moving in )
3) Bathroom Tiles crack and fell off within the 1st week. They got the cheek to tell me my contractor did it when its those tiles that they mount the standard HDB shower heads. Best is when they come to fix they discover that only got a bit of cement sticking the tiles and below its all hollow.
4) The cloth hanging fixture before I can use it its already spoil. 1 pull one side comes down the other side stuck have to have them fixed it b4 I even move in :(
So my advice to all bros out there check your new pegion hole properly.