• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

Electrical work halted at World Cup stadium after worker's death

Arena

Alfrescian (Inf)
Asset

Electrical work halted at World Cup stadium after worker's death


BRASILIA Fri May 9, 2014 7:08pm BST

r


Paramedics arrive at Arena Pantanal stadium, one of the venues for the 2014 World Cup, in Cuiaba May 8, 2014. REUTERS/Stringer

(Reuters) - Electrical work at a World Cup stadium under construction in the Brazilian city of Cuiaba was halted until safety precautions were taken, following an electrical accident that killed a worker, labour authorities said on Friday.

The labour prosecutor's office in Mato Grosso state said that Etel Engenharia ,the electrical contractor, must assure safety conditions for workers before it can resume work at Arena Pantanal.

Muhammad-Ali Maciel Afonso, 32, who worked for the contractor, died after an electrical accident on Thursday at Arena Pantanal. Afonso was the eighth worker to die during construction of twelve arenas that will host games for the month-long football competition.

Builders were scrambling to finish several stadiums on time before the tournament starts on June 12.

Arena Pantanal, in the heart of Brazil's farm belt, is one of three delayed World Cup stadiums still being built.

The unfinished stadium held a test match last month, but workers are still adding seats, wiring and other final touches. An October fire caused structural damage at the stadium that has since been repaired.

The 2014 World Cup, the first to be held in Brazil since 1950, has been beset by delays, cost overruns and broken promises. In addition to the late delivery of stadiums, several key public transportation projects have been scaled back or abandoned altogether.

(Reporting by Alonso Soto; Editing by Jeffrey Benkoe)

 
Top