- Joined
- Jul 12, 2008
- Messages
- 9,884
- Points
- 0
I dont think so with the construction still going on and many crane still in the area.
Sands really talk cock keep on saying will open this/that date many times that I has lost count. I guess more than 5 times. Delay about 2 years behind schedule and cost have overrun with the compounded interest in 2 years and material cost up sure doom for the Sands.
Sands really talk cock keep on saying will open this/that date many times that I has lost count. I guess more than 5 times. Delay about 2 years behind schedule and cost have overrun with the compounded interest in 2 years and material cost up sure doom for the Sands.