• IP addresses are NOT logged in this forum so there's no point asking. Please note that this forum is full of homophobes, racists, lunatics, schizophrenics & absolute nut jobs with a smattering of geniuses, Chinese chauvinists, Moderate Muslims and last but not least a couple of "know-it-alls" constantly sprouting their dubious wisdom. If you believe that content generated by unsavory characters might cause you offense PLEASE LEAVE NOW! Sammyboy Admin and Staff are not responsible for your hurt feelings should you choose to read any of the content here.

    The OTHER forum is HERE so please stop asking.

ALL ex-British Colonies are Dishonest Bastard Swines eat Chow Ang Moh Shit, China should never trust HK! Japs too!

democracy my butt

Alfrescian
Loyal
Jap recent years caught and admitted repeatedly major INDUSTRIAL FRAUDS & FALSIFICATIONS of SAFETY & QUALITY. Bow Kowtow to appologize. SMRT & HK MRT ALSO. Now caught they also defraud the engineering works undertaken in 港珠澳 mega bridge tunnels and DESTROYED RECORDS & EVIDENCE! Fucking incompetent and Corrupted Bastards caused 2 years delays and make full of Quality Safety Frauds! Destroyed Records to Cover Up!

Mainland should NEVER entrust them anything. All of major infrastructure engineering works must be done only by mainland contractors. Don't let them have any chance to cheat and ruin projects! CBs!




1549790706571.jpeg

https://hk.news.yahoo.com/傳港珠澳大橋失萬五張施工紀錄-214500846.html

傳港珠澳大橋失萬五張施工紀錄


東方日報 OrientalDaily


5.1k 人追蹤

東方日報
2019年2月10日 上午5:45


1962a19bd4c3d5fff974bdfe6ce7f0cf

港珠澳大橋亦傳出消失大量的檢查及測量申請表格。
【本報訊】繼沙中線紅磡站後,港珠澳大橋也傳出「消失」大量檢查及測量申請表格(RISC Form),數量多達一萬五千張,令人嘩然,更傳顧問公司事後為了「補鑊」,而提交後補的表格。本報正向路政署查詢事件。

佔整體表格逾20%

消息人士說:「消失的表格佔港珠澳大橋工程逾兩成,有人為了趕及大橋去年通車,在無檢驗結構的品質安全清況下,填回那些不存在的表格,務求補充回失去的表格,假裝所有工程檢驗完成。」

其中一個例子是承建商於二○一六年六月廿四日在某位置把鋼筋扎好,準備落石屎,並打電話通知顧問公司駐地盤人員驗收,而非簽發表格,但因時間緊迫,在無顧問公司駐地盤人員驗收鋼筋清況下,承建商翌日便落石屎了。

事隔兩年後,到去年七月十六日,上述情況被發現,有人希望趕及大橋九月通車,便要求承建商和顧問公司一定要後補那些消失的表格,但在二○一六年負責該位置的工程師已離職。

工程兩年後才簽表格

有人為了後補表格,疑要求根本不是負責該位置的工程人員簽發表格,確認品質合乎要求。

本報得到的文件顯示,港珠澳大橋顧問公司去年七月去信承建商追收表格表示不滿,並形容事件是嚴重缺失,信件副本呈交路政署。

另一份表格則顯示,工程早在二○一六年進行,但工程人員去年才簽名。

立法會議員尹兆堅批評路政署嚴重失職,港府好大喜功,為了趕及大橋通車,吹噓大灣區,而罔顧公眾安全,「港珠澳大橋已經有好多工程問題,而今消失萬五張表格,大橋是否還安全呢?」他又擔心,連串基建醜聞,大大打擊市民對工程界信心。



Hong Kong-Zhuhai-Macao Bridge lost five construction records

[Oriental Daily OrientalDaily]
Oriental Daily OrientalDaily

5.1k person tracking

Oriental Daily
February 10, 2019, 5:45 am


The Hong Kong-Zhuhai-Macao Bridge also reported a large number of inspection and measurement application forms.
The Hong Kong-Zhuhai-Macao Bridge also reported a large number of inspection and measurement application forms.

[Reporter] Following the Shazhong Line Hung Hom Station, the Hong Kong-Zhuhai-Macao Bridge also reported a "disappearance" of RISC Forms, which amounted to 15,000. The company submitted the form to be supplemented in order to "replenish". The newspaper is consulting the Highways Department for the incident.

More than 20% of the overall form

The source said: "The disappearing form accounts for more than 20% of the Hong Kong-Zhuhai-Macao Bridge project. In order to catch up with the opening of the bridge last year, in the absence of quality and safety of the inspection structure, the forms that do not exist will be filled back to replenish the lost. Form, pretend that all engineering inspections are completed."

One example is that the contractor took the rebar at a certain location on June 24, 2016, prepared to drop the stone, and called the consultant's resident staff to accept the inspection instead of issuing the form, but due to time constraints, Under the condition that the unrecognized company resident staff accepted the rebar, the contractor fell on the next day.

Two years later, on July 16 last year, the above situation was discovered. Some people hoped that the bridge would be opened to traffic in September, and the contractors and consultants would have to fill in the missing forms, but in 2016. The engineer responsible for the position has left the company.

Sign the form only two years after the project

In order to supplement the form, some people are not responsible for the issuance of the form by the engineering personnel responsible for the location, confirming that the quality meets the requirements.

According to the documents obtained by the newspaper, the Hong Kong-Zhuhai-Macao Bridge Consultant Company expressed its dissatisfaction with the contractor's recovery form in July last year and described the incident as a serious deficiency. A copy of the letter was submitted to the Highways Department.

Another form shows that the project was carried out as early as 2016, but the engineers signed it last year.

Legislative Council Member Yin Zhaojian criticized the Highways Department for its serious dereliction of duty. The Hong Kong Government was very happy. In order to catch up with the opening of the bridge and to brag about the Dawan District, and to ignore public safety, "the Hong Kong-Zhuhai-Macao Bridge has many engineering problems. Today, the table is disappearing. Is it safe?" He is also worried that a series of infrastructure scandals will greatly undermine the public's confidence in the engineering community.
 